Construction and Fitout of Gatepost 9 and Substation – Dublin Airport

– Client: Kilwex  (on behalf of the DAA)

The scope of this project (New Substation T and Security Gate 9) involved the complete construction and fitout of a new Control Post 9 and parallel to this a new Substation.

Works included:

  • Blockwork
  • Steelwork
  • Aluminium windows and doors
  • Plastering
  • ESB grade steel doors
  • Studwork
  • MF ceilings
  • Fireproofing
  • Oak doors
  • Vinyl flooring
  • Painting and finishes