Conynham Road Temporary Structural Works
Client: Irish Rail
The overall objective of this project was to install temporary structural steel works to an existing derelict building.
The general works included:
- Site mobilistation and set up.
- Install temporary access points to the building.
- Remove obstructive vegetation.
- Carry out structural improvement works to specific locations (chimneys, doorways etc.)
- Carry out full dimension survey of the building.
- Install structural steel frames.
- Demobilise from site.